Engineering, Procurement, Construction

Ikshu Bio delivers end to end solutions for projects, including process design, equipment integration and site execution ensuring high-efficiency, compliant and scalable BioCNG infrastructure.

Smart & Scalable BioCNG Solutions

Key Process Sections in Ikshu EPC Execution

Ikshu Bio structures every BioCNG plant around well-defined engineering sections to ensure process clarity, operational efficiency, and seamless integration. Each section is meticulously designed and executed for optimal performance and compliance.

01

Feeding System

  • Biomass reception, sorting, and size reduction

  • Dosing units and conveyors for continuous input

  • Custom feeding systems for varied feedstock types (press mud, IWE, Napier, etc.)

02

Anaerobic Digestion (AD)

  • High-efficiency digesters with agitation and heating systems

  • Temperature and pH monitoring for optimal microbial activity

  • Designed for steady gas yield and hydraulic retention

03

Slurry Line

  • Post-digestion slurry handling for dewatering and separation

  • Solid and liquid digestate pathways for organic fertilizer production

  • Pumps, agitators, and storage units included in the scope

04

Gas Line

  • Biogas scrubbing and upgrading systems

  • Compression, bottling, and metering units

  • Pipeline integration for CGD or cascade transport

Prototype Plant

Designed for Feedstock Validation and Process Optimization

This prototype BioCNG plant is developed to test various feedstock types and combinations, analyze Hydraulic Retention Time (HRT), and monitor key operational parameters. It allows us to simulate full-scale conditions and determine the most efficient mix and process for optimum gas generation before scaling up.

An essential step in designing reliable, efficient and site specific BioCNG infrastructure.

Prototype Plant2

Technology & Research Compnay

From Concept to Commissioning – Complete BioCNG Plant Delivery​

Process & Plant Design

  • Feasibility analysis and site layout planning

  • Process flow diagrams (PFDs) and P&IDs

  • Equipment sizing, utility balance, and 3D plant modeling

  • Integration of biogas purification, compression, and storage systems

Procurement & Equipment Supply​

  • Sourcing of key components: digesters, gas scrubbers, compressors, storage tanks, etc.

  • Vendor evaluation and selection based on quality, compliance, and lead time

  • Control systems, instrumentation, and automation hardware procurement

Civil, Mechanical & Electrical Erection

  • Civil works: land development, foundations, RCC tanks, and plant structures

  • Mechanical erection of equipment, pipelines, and fittings

  • Electrical panel installation, cable routing, and safety systems

Testing & Commissioning​

  • On-site system testing, performance validation, and trial runs

  • Staff training for safe and efficient operations

  • Compliance with regulatory standards (SATAT, MNRE, PESO)

  • Final handover with as-built documentation