HOME / IMPACT

Impact measured, method attached.

Impact claims in this sector are usually multiplications of assumptions. Ours carry their method next to the number, and anything not yet measured stays visibly marked as pending until first-cycle reporting publishes it. A figure you cannot audit is a figure we have not earned.

The chain Farmer Clean energy Employment Soil Organic food Lives Environment
Value Retention Ratio
TARGET
60 %
of gross feedstock value taken from the catchment returns to it. This is the single number we hold ourselves to, because it is the one that cannot be met by building a plant somewhere and calling it development.
Method
Value returned to the sourcing catchment — residue payments, fertiliser sold back at cost-plus, wages paid locally, and procurement spent inside the district — as a share of gross feedstock value taken out of it. Publishes with first-cycle reporting.
~13,300 tCO₂e
Avoided per 10 TPD plant, per year
Method
Estimate: methane captured vs open decomposition, plus displaced fossil CNG.
1M t CO₂e
Avoided annually at full build-out
Target · not yet achieved
Parks × capacity × operating days; biomethane displaces natural gas 1:1 on an energy basis at ≈2.75 t CO₂ per tonne.
~9,000 t
TARGET
Fertiliser returning to farmland each year, per plant
Method
Projected from digestate yield at rated output. Dispatch records and nutrient tests publish with first-cycle reporting.
01
Link one

The farmer is paid twice for the same field.

Residue that was burnt because clearing it cost money now carries a price at the gate — and the fertiliser made from it comes back priced to be bought, not donated. That is the whole design: the supplier and the customer are the same household, which means the business cannot succeed while the catchment gets poorer. Procurement runs through farmer producer organisations and cooperatives where they exist, so the aggregation margin stays local rather than going to an intermediary.

What we will report
Residue payments made, by village FIRST CYCLE
Farmers supplying, by holding size FIRST CYCLE
Fertiliser sold back into the catchment FIRST CYCLE
Share of procurement through FPOs FIRST CYCLE
02
Link two

Fuel made where it is burnt.

India imports close to half the natural gas it consumes. Every kilogram of BioCNG produced in a district and dispensed in that district is a kilogram that did not arrive by tanker, and the energy security argument is as strong as the emissions one. Gas is sold under a contracted offtake framework with a mandated blending obligation behind it, so the demand is not speculative — the constraint on this sector is supply, and always has been.

What we will report
BioCNG dispatched, per plant FIRST CYCLE
Fossil CNG displaced, energy basis METHOD PUBLISHED
Distance from plant to dispensing point FIRST CYCLE
03
Link three

Rural jobs that do not require leaving.

A plant needs collection crews, drivers, weighbridge and yard staff, operators, laboratory technicians and maintenance fitters — most of them permanent, most of them local, and none of them requiring migration to a city. The collection network employs more people than the plant does, and it employs them in the villages the residue comes from. We report headcount, not "jobs supported", because the second number can be made to say anything.

What we will report
Direct headcount, permanent and seasonal FIRST CYCLE
Collection network headcount FIRST CYCLE
Share hired within the district FIRST CYCLE
Women in the workforce FIRST CYCLE
04
Link four

Organic carbon put back where it was taken from.

Soil organic carbon across much of the world's cropland has fallen below the level at which soil holds water through a dry spell — which is the difference between a bad month and a failed season. Digestate returns carbon and nutrients to the same fields the residue came from. We test what we sell for nutrient content and organic carbon, and the test travels with the product rather than sitting in a drawer.

What we will report
Fertiliser tonnage returned to farmland FIRST CYCLE
Nutrient and organic carbon test results FIRST CYCLE
Hectares receiving digestate FIRST CYCLE
05
Link five

Cheaper organic input, not a premium one.

Organic farming in India is mostly constrained by input cost and input availability, not by willingness. A plant producing thousands of tonnes of tested organic fertiliser a year inside a single district changes the local price of that input. The food grown on it is the last link in the chain and the one furthest from our control — but the input is where the constraint actually binds, and that is the link we can move.

What we will report
Fertiliser price against local alternatives FIRST CYCLE
Repeat purchase rate among growers FIRST CYCLE
Certified organic hectares supplied AWAITING DATA
06
Total one

The first total: households, not beneficiaries.

"Lives touched" is the least trustworthy number in impact reporting, because it is usually a population figure multiplied by proximity. We will report households in a direct commercial relationship with a plant — selling residue to it, buying fertiliser from it, or employed by it — counted from records, and we will report the three categories separately so nobody has to take the total on trust.

What we will report
Households selling residue FIRST CYCLE
Households buying fertiliser FIRST CYCLE
Households with employment income FIRST CYCLE
Overlap between the three FIRST CYCLE
07
Total two

The second total: emissions, counted on both sides.

BioCNG earns its emissions case twice — methane captured that would otherwise have escaped from an open field or a landfill, plus fossil gas displaced at the pump. Both are countable, and both are stated separately here rather than combined into one flattering figure. The stubble not burnt also removes a seasonal air quality load that is real but which we do not attempt to convert into a tonnage.

What we will report
Methane captured vs open decomposition METHOD PUBLISHED
Fossil gas displaced, 1:1 energy basis METHOD PUBLISHED
Residue diverted from open burning FIRST CYCLE
Waste diverted from landfill FIRST CYCLE
08
How we report

Three rules we do not break.

01
Method next to number

Every figure on this site carries the calculation that produced it, in the same block. A number without a method is a claim, and we do not make claims.

02
Pending stays pending

Anything not yet measured is marked and stays marked. We would rather publish an empty row than a modelled one dressed as a result.

03
Counted, not estimated

Where a thing can be counted from records — tonnes, payments, headcount, hectares — we count it. Estimates are reserved for what genuinely cannot be.

Hold us to the ratio.

First-cycle reporting publishes from the research plant onward. If a number moves the wrong way, it will still be here.

The research plant What we stand on